Archive for May, 2012

Trench for gas pipe (30May12)

Wednesday, May 30th, 2012


Not very interesting I know, but I have recorded the stages of construction for the gas pipe trench so that I can demonstrate to a registered plumber that it complies with regs. I have also put a second pipe in the trench in case I need to lay anything else in the future to save digging again. I used two lengths of 1.5 inch pipe as conduit.

New gas tank helipad and trench (18May12)

Friday, May 18th, 2012

I constructed a new pad for the tank which is compliant with building regs – just need to dig a trench to the house 330mm deep which is easier said than done through rock. Good job I have the hammer drill/chisel.

An Almost Lounge (07May12)

Monday, May 7th, 2012

Looking almost homely – we have painted walls, curtains and a 3 piece suite. Just need shirtings, flooring, architrave, light fittings, heating……….

 